July 2014 – RTD FasTracks East Rail Line News

http://www.stapletondenver.com/wp-content/uploads/July-2014-East-Rail-Line-News-768x400.jpg

DOWNLOAD THE JULY 2014 EAST RAIL LINE NEWS

Construction Completed

– Reconstruction of 40th Avenue between Blake and York streets, including installation of sidewalks and drainage measures
– Southbound Quebec Street, between Sandown and Smith roads, frontage road reconstruction and crossing panel installation
– Installation of girders on the I-70 Flyover Bridge over the Union Pacific Railroad (UPRR) lines

Construction Underway

– Ulster Street railroad crossing construction in Denver, just north of Smith Road
– Reconstruction of the Chambers and Smith roads intersection and railroad crossing
– Installation of track along the line between I-70 and 40th Avenue, in Aurora, and on Smith Road  between Holly and Quebec streets in Denver

Upcoming Construction

Roadway repaving on Moline Street between 33rd Avenue and Smith Road
– Installation of the overhead electrical wire at DIA, between the DIA solar farm and the future commuter rail station
– Setting the pedestrian bridge over the UPRR at the 38th/Blake Station that will connect the future Park-n-Ride to the station

For more project information: rtd-fastracks.com