Construction Completed

– Corridor protection barrier wall construction on 40th Avenue between Blake and York streets
– Installation of signal lights at the Chambers and Smith roads intersection in Aurora
– Waterline work at the Central Park Station in Denver
– Grading for the bus loop at the 40th/Colorado Station in Denver

Construction Underway

– Storm drain installation and paving on Wynkoop Street between 38th and 40th streets in Denver
– Installation of the drainage measures for the I-70 Flyover Bridge in Aurora
– Construction of the bus loop at the Peoria Station Park-n-Ride in Aurora

Upcoming Construction

– Installation of pedestrian gates at the Steele and Clayton crossings in Denver
– Final asphalt installation on 33rd Avenue between Moline and Peoria streets and on Moline Street between Smith Road and 33rd Avenue in Aurora
– Roadway work on Blake Street between 38th and 40th streets in Denver